Case Study

Producing energy in Guadalajara, Jalisco, to power the packaging industry

Guadalajara, Jalisco

Hot Air icon

Electricity

Electricity generation

Hot Air icon

Steam

Steam generation

CONSUMPTION
28,408,680 (100%)
GENERATION
18,693,840 (65.80%)
DEMAND
3,626,640 (100%)
INVOICED DEMAND AVOIDED
2,502,381.6 (69%)

INSTALLED EQUIPMENT

2 Microturbinas C200S

FUEL

Gas natural

RESULTS

52% energy consumption savings

Description

DTC Soluciones and the packaging industry joined forces in the search for a solution for the power supply system, which in addition to helping them to reduce costs, would also have an environmental benefit by reducing their polluting emissions.

According to the data provided by the company, it was found that the average energy consumption is 267 kWh, so the plant would need the installation of 2 Capstone C200 Microturbines to cover 52% of its electricity consumption and 69% of its billable demand.